Grimmer Construction is committed to excellence.  Client needs come first on every project – from small sewer work to design and reconstruction of major thoroughfares. Industries, municipalities, engineers, and developers often call upon us for design ideas and future planning. This consultation 
has developed relationships that go beyond single projects.


 
   Town Square Shopping Center, Schererville
      
This $1.3 million project included the site excavation,
       utility installation, and all paving and curb work for
       the new, multi-store, multi-front, 13 acre retail facility
       at the intersection of US 41 and Main Street.

Town_Square.gif (363461 bytes)


 
   R&R Industrial Park, Hammond
      
Site rework, utility installation and paving in this existing
       industrial park at 165th Street took place under ongoing
       commercial traffic conditions.

     Ravenswood Business Center, St. John
      
A $1.0 million project at the 12-lot, multi-acre subdivision
       on US 41, including site excavation, utility installation,
       paving and curbs. 

back to top


    Cargill (formerly Cerestar USA) Hammond, IN
      
Multiple projects at this industrial corn processing plant,  
       ranging from small sewer maintenance work to the design 
       and reconstruction of the entire plant traffic and parking
       system.  

    NIPSCO Industries, Wheatfield IN
       Rehabilitation of the sanitary lift station at the Baily
       electric generating station.

    Rhodia, Hammond IN
      
Ongoing, repair and maintenance of the site infrastructure at
       this chemical processing facility.  

    US Gypsum, East Chicago IN 
       Installation of a pre-cast concrete lift station for a 30" fire
       intake line as part of major facility renovation at this 
       nationwide manufacturing facility.

back to top

US_Gypsum.gif (308532 bytes)



    Bridgewood Estates, Merrillville IN
      
Site excavation, utility installation, paving and curb work for
       the initial phase of this 60-lot development.

   Springrose Heath Subdivision, Schererville IN
       Completed all 5 phases of site excavation, utility 
       installation, paving and curb work for this 200-lot, single
       family home subdivision

    Brookstone Estates, Merrillville, IN
       Phases 1 and 2 of this multi-story condominium complex,
       including site excavation, utility installation, paving and 
       curb work

back to top

Brookstone.gif (380980 bytes)



   Town of Griffith IN
       An $800K project to relocate an 18" force main, jacking five
       separate pipe casings, under the I80/94 expressway, 
       entrance/exit ramps, and Little Calumet River

    Town of Burns Harbor IN
      
A $6.8 million sanitary sewer system consisting of the 
       installation of 70,000 linear feet of new sanitary sewer, six
       lift stations, and street reconstruction for the entire town

    Town of Highland IN
      
A $3.9 million downtown revitalization including roadway,
       sidewalk, underground utilities, lighting and landscaping

Highland.jpg (28390 bytes)